Please use this identifier to cite or link to this item:
http://umt-ir.umt.edu.my:8080/handle/123456789/9898
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Wan Siti Aishah Wan Hassan | - |
dc.date.accessioned | 2018-11-18T02:19:31Z | - |
dc.date.available | 2018-11-18T02:19:31Z | - |
dc.date.issued | 2012 | - |
dc.identifier.uri | http://umt-ir.umt.edu.my:8080/xmlui/handle/123456789/9898 | - |
dc.description.abstract | The compatibility of shipyard design and its layout affect the production of the shipbuilding. This study concerns about the production workflow at shipbuilding workshop and its optimization to improve its productivity. Productivity and efficiency of a shipyard workshop are influence by various factors such as layout of equipment, facilities and working area. ln this project, the project flow at MSET Shipbuilding had been studied and identify whether it can be optimised or not and will convey the readers on how the layout can influence the productivity of work at shipyard. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Universiti Malaysia Terengganu | en_US |
dc.subject | LP 43 FMSM 2 2012 | en_US |
dc.subject | Wan Siti Aishah Wan Hassan | en_US |
dc.title | A study on shipbuilding productivity and its correlation with shipyard layout at MSET shipbuilding at Pulau Duyung | en_US |
dc.type | Working Paper | en_US |
Appears in Collections: | Fakulti Pengajian Maritim dan Sains Marin |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
LP 43 FMSM 2 2012 Abstract.pdf | 801.14 kB | Adobe PDF | View/Open | |
LP 43 FMSM 2 2012 Full Text.pdf Restricted Access | 5.06 MB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.