Please use this identifier to cite or link to this item: http://umt-ir.umt.edu.my:8080/handle/123456789/6972
Title: PRELIMINARY ECOLOGICAL INPUT ASSESSMENT OF EIAS OF SELECTED QUARRIES AND OIL PALM PLANTATION PROJECTS IN SABAH, MALAYSIA
Authors: WAN CHING CHEW
LEONG WAN VUN*
Keywords: Environmental impact assessment
ecological input
quarry activities
oil palm plantation activities
Issue Date: 2013
Publisher: Journal of Sustainability Science and Management
Abstract: Since the introduction of Environmental Quality Act (Prescribed Activities) (Environmental hnpact Assessment) Order 1987 in Malaysia, submission of an environmental impact assessment (EIA) report for approval is mandatory before the commencement of any of the prescribed activities. However, the insufficient ecological inputs have always been the major shortcomings of most EIA reports. Thus, this study aims to critically review EIA reports and compare the ecological input between EIA reports of quarry and oil palm plantation activities using a designated checklist. The common weaknesses identified in both EIA reports of quarry and oil palm plantation activities include the inadequacy of survey's coverage and duration, description of flora and fauna species without quantification and status, surveys which showed bias toward terrestrial ecosystem than aquatic ecosystem and impacts prediction which were descriptive in nature. It was found that greater emphasize ofecological input was on site assessment for the quarry activities whereby mitigating measures and monitoring programmes were emphasized in the oil palm plantation activities.
URI: http://hdl.handle.net/123456789/6972
ISSN: 18238556
Appears in Collections:Journal Articles

Files in This Item:
File Description SizeFormat 
3w.pdf10.09 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.